VTech Solution · Sahibabad, Ghaziabad · Authorised Jotun & Graco Distributor Call +91 98111 70042 sales@vtechsolution.co.in

How to Read a Coating Specification: Primer, Intermediate, Topcoat and DFT

How to Read a Coating Specification: Primer, Intermediate, Topcoat and DFT

How do you read a coating specification?

To read a coating specification, find four things: the surface preparation grade, the list of coats (primer, intermediate, topcoat), the dry film thickness (DFT) for each coat, and the inspection and cure requirements. Then check each coat against the product data sheet to confirm compatibility.

A coating specification can look like a wall of codes: Sa 2.5, 2 x 100 microns, C4, 12 years. For a plant manager, a purchase officer or a contractor pricing a job, it helps to know what each line is really asking for. A misread coating specification leads to the wrong paint being bought, thin films, and disputes at handover. This guide walks through a typical specification in plain English, so that you can read it, question it and price it properly in Indian conditions.

What a coating specification is meant to do

A specification is the owner’s written instruction for how a steel or concrete surface will be protected. It tells the applicator what to do, tells the supplier what to supply, and tells the inspector what to check. It should answer five questions: what surface, what preparation, what paint system, what thickness, and what proof of quality.

Specifications come from several places. An EPC contractor may issue one for a project. A consultant may write one for a new plant. A maintenance team may write one for a shutdown. Some are very detailed, and others are one page. Either way, the structure is similar, and the same questions apply.

Section 1: Scope and environment

The opening section describes where the coating will be used. Read this carefully because it decides everything after it. Look for:

  • Type of item: structural steel, tank, pipe, equipment, machine base, roof or floor.
  • Location: indoors, outdoors, coastal, industrial or chemical area.
  • Operating temperature of the surface.
  • Expected life before first major maintenance.
  • Any special needs such as fire protection, food-grade or slip resistance.

Many specifications refer to corrosivity categories from ISO 12944, usually written as C2, C3, C4, C5 and so on, with higher numbers meaning a harsher environment. A category is a general description of how aggressive the air is. It does not by itself tell you which product to use. If your specification gives a category, share it on the call.

Section 2: Surface preparation

This is the line many people skip, yet it matters most. Typical entries include:

Entry What it means
Sa 2.5 (ISO 8501-1) Very thorough abrasive blast cleaning, with only slight stains left on the steel
Sa 2 Thorough blast cleaning, a lower standard than Sa 2.5
St 2 or St 3 Hand or power tool cleaning, with St 3 being more thorough
Surface profile The roughness of blasted steel, measured in microns, that lets primer grip
Salt and dust limits Maximum permitted contamination before painting

Preparation grades also relate to SSPC cleaning standards, which use different names for similar levels. When a specification quotes one standard, do not assume another is equal. Ask the consultant or check the document.

Also check the time limit between cleaning and priming. Blasted steel rusts quickly in humid weather, so the specification often asks for priming within a few hours, or before visible flash rust appears.

Section 3: The paint system, coat by coat

This is the heart of the coating specification. It lists each layer, its type and its thickness. Here is a typical layout:

Coat Generic type Role
Primer Epoxy primer (Penguard family) Bonds to steel and gives first corrosion protection
Intermediate High-build epoxy (Jotamastic family) Builds thickness and blocks moisture
Topcoat Polyurethane (Hardtop family) Protects against sun and weather, gives colour

Some specifications use a zinc-rich primer instead of an epoxy primer, or a two-coat system without an intermediate. Where a specification calls for a specialist primer such as zinc silicate, or a heat-resistant coating, VTech will confirm the matching Jotun product and availability from the range on the call. We do not guess product names.

Primer

The primer touches the steel. It must suit the surface preparation grade and the environment. A primer written for blasted steel may not be suitable for tool-cleaned steel, so check this against the data sheet.

Intermediate coat

The intermediate adds thickness. It is often the thickest coat. Where a specification skips it, the primer and topcoat must do more work, and DFT is usually the issue.

Topcoat

The topcoat handles sun, weather, chemical splash and appearance. Polyurethane topcoats hold colour and gloss outdoors better than plain epoxy, which tends to chalk in strong sunlight. Our protective coatings page shows the range.

Section 4: Reading DFT correctly

DFT stands for dry film thickness, the thickness of cured paint measured in microns (one micron is a thousandth of a millimetre). It appears in a specification in forms like these:

  • Per-coat DFT: primer 75 microns, intermediate 150 microns, topcoat 50 microns, as an example of format only.
  • Total system DFT: the sum of all coats.
  • Minimum DFT: the lowest acceptable reading.
  • Nominal DFT: the target thickness.

The numbers above are examples of layout, not recommendations. The right numbers come from the project and the product data sheet.

Dry film is not wet film

Paint shrinks as solvent leaves. Wet film thickness is what goes on, and DFT is what remains. The data sheet gives the volume solids of the paint, and you can use it to work out the wet film needed for a target DFT. Applicators use wet film combs during spraying to check this as they go.

How many readings count

Specifications often say how many readings are taken per area, and how many low readings are allowed. Some use a rule that most readings must reach the specified DFT, and none may fall far below it. Check what yours says. If it says nothing, agree a method in writing before work starts.

Theoretical and practical coverage

Data sheets list theoretical coverage in square metres per litre at a given DFT. Real coverage is lower because of losses from spray, wind, rough steel and leftover paint in cans. Allow a sensible loss factor when ordering. We help buyers work this out during the call.

Section 5: Application conditions and cure times

Most specifications list when painting is allowed. Typical limits cover:

  • Minimum and maximum air and steel temperature.
  • Maximum relative humidity.
  • Steel temperature above dew point by a stated margin.
  • No painting in rain, fog or heavy dust.

Delhi NCR winter mornings can have fog and smog moisture, and monsoon days are humid. Summer steel under direct sun can run too hot to paint. A good specification respects these limits, and a good site supervisor enforces them.

Also look for the overcoating interval, meaning the shortest and longest time between coats, and for full cure times before the item goes into service, is handled or is immersed. These come from the data sheet at a given temperature, and they change with weather.

Section 6: Inspection, testing and records

A good coating specification sets hold points. These are stages where the applicator must stop and let the inspector check before continuing. Common hold points are:

  1. After surface preparation, for cleanliness and profile.
  2. After primer, for coverage and DFT.
  3. After each further coat.
  4. After the final coat, for total DFT, appearance, runs, holidays and colour.

Adhesion tests, holiday detection and visual checks may also be listed. Keep the records. They matter when you need to prove what was done, or claim under any applicator warranty.

Common problems when reading a coating specification

  • Brand-specific wording with no equivalent. If a specification names a product you cannot get, ask the consultant for an approved equal and send the data sheets for review.
  • Conflicts between sections. One page asks for a primer at 60 microns, and another table says 80. Raise the conflict before ordering.
  • Missing temperature data. A specification for a hot line that does not state the temperature is incomplete.
  • Unrealistic prep. Sa 2.5 blasting specified for a running plant where blasting is not allowed.
  • Old or copied clauses. A document copied from another project may refer to conditions that do not apply here.
  • No cure or recoat information. Without it, crews guess.

A quick checklist for buyers and contractors

  • Is the surface and environment clearly described, including temperature?
  • Is the preparation grade stated, and can you achieve it on site?
  • Does each coat have a generic type, product and DFT?
  • Is the total DFT stated, along with the method of measurement?
  • Are application conditions, overcoating intervals and cure times listed?
  • Are inspection hold points and record requirements stated?
  • Do the coats come from one compatible system, according to the data sheets?

If you can answer yes to these, the coating specification is usable. If not, send it to us with your questions. VTech, an authorised Jotun distributor and dealer in Sahibabad, reviews specifications for buyers across Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon and Faridabad. We can match the specification to the Jotun range, subject to stock. Our products and industrial solutions pages give an overview of what we handle.

How to get started: what to tell us when you call

Ring call +91 98111 70042 between 10am and 6pm, Monday to Saturday. Please keep these ready, or send them to sales@vtechsolution.co.in:

  • A copy or photo of the coating specification, or the relevant pages.
  • The item and area to be coated, in square metres.
  • Environment, corrosivity category if given, and operating temperature.
  • Preparation method you can carry out on site.
  • Any named products and whether an equal is allowed.
  • Approval route: who signs off, the consultant, the client or the EPC.
  • Delivery location and target date.

We will confirm the matching Jotun products and availability, and quote prices on the call. You can also write through the contact page.

Frequently asked questions

What does DFT mean in a paint specification?

DFT means dry film thickness, the thickness of the cured paint in microns. A specification gives a DFT for each coat and a total for the system. Applicators check it with a calibrated gauge, and the data sheet gives the recommended range.

What does Sa 2.5 mean?

Sa 2.5 is a grade in ISO 8501-1 for very thorough abrasive blast cleaning, leaving only slight stains on the steel. It is a common requirement before epoxy primers. Always confirm the grade your primer data sheet requires.

Can I use an equal product if the specification names another brand?

Only if the specification allows approved equals and the consultant or client agrees. Send the data sheets of the proposed system for review. Do not substitute without written approval, because it can affect acceptance and warranty.

Why do I need the data sheet as well as the specification?

The specification tells you what to achieve. The data sheet tells you how the product must be applied: DFT range, cure times, overcoating intervals and temperature limits. The two must agree, so check each coat against its data sheet.

What should I check first in a coating specification?

Start with the environment and operating temperature, then the surface preparation grade, then the coat list with DFT. These three decide whether the system is suitable and whether the job can be done on your site.