Fire Rating of Steel Structures: 30, 60, 90 and 120 Minutes Explained

Fire Rating of Steel Structures: 30, 60, 90 and 120 Minutes Explained

What is the fire rating of steel structures?

The fire rating of steel structures is the time, in minutes, that a beam, column or floor member keeps its load-carrying ability when exposed to a standard test fire. A 60 minute rating means the member is expected to hold for one hour. The rating comes from the building category and fire approval needs.

Owners of steel buildings in Delhi NCR often hear numbers like 60 or 120 from their consultant and nod without being sure what they mean. The fire rating of steel structures is one of the most important figures on a drawing, because it decides what protection you must pay for. This guide explains what the numbers mean, how they differ, where they come from and how they connect to the coating you apply.

What a fire rating actually measures

A fire resistance rating is not a promise about how long a real fire will take to destroy your building. It is a laboratory-based measure. A sample member is loaded and placed in a furnace, where the temperature is raised along a standard time-temperature curve. The time the member survives while performing its role, such as carrying load, is its fire resistance period. Plain unprotected steel typically survives only a short time in such a test, often well under thirty minutes for light sections. Protection, such as an intumescent coating, extends that time.

Real fires differ from the test. A fire in a paper warehouse or a plastics store may burn faster and hotter than the standard curve, while a fire in a well-compartmented office may burn slower. The rating is a common yardstick for design, not a forecast.

What 30, 60, 90 and 120 minutes mean in practice

Rating Meaning Typical thinking
30 minutes The member should hold load for half an hour Lower-risk or small buildings, some single-storey structures, light mezzanines
60 minutes One hour of structural performance Many commercial and industrial buildings of moderate height
90 minutes One and a half hours Larger or more important buildings, higher occupancy
120 minutes Two hours High-rise, high-occupancy or high-hazard buildings, key columns and escape structures

The last column is only a general guide. The actual rating for your project must come from your approved fire safety design and the local authority, not from a table in a blog. Different parts of the same building can carry different ratings. For example, the main columns may need 120 minutes while the roof purlins need none or much less.

Where the required rating comes from

In India, fire safety requirements for buildings are set out in the National Building Code of India 2016, Part 4, Fire and Life Safety. State and local fire services apply it with their own rules and amendments. The code groups buildings by occupancy type and height and sets minimum fire resistance for structural elements. Your architect and fire consultant read the code for your building, then state the fire rating of steel structures in the drawings and specification.

Do not guess the rating. If your approval document or consultant drawing does not state it, ask in writing. A wrong guess can mean either an expensive overspecification or an under-protected structure that fails inspection at the end of the project.

Questions to put to your consultant

  • What rating is needed for columns, primary beams, secondary beams, roof members and floors?
  • Is the rating different for different floors or compartments?
  • Is any steel excluded, for example a light single-storey roof?
  • Is protection to be applied in the shop, on site, or both?
  • What proof of thickness will the authority expect?

Why two beams with the same rating need different coating

The rating is only half the equation. The other half is the steel itself. A slim, light beam has a lot of surface for its weight, so it heats up quickly. A heavy, thick column has more steel to absorb the heat, so it heats up slowly. Engineers describe this with a section factor. The higher the section factor, the thicker the coating needed for the same fire rating.

This surprises many buyers. A warehouse with light, cold-formed or built-up sections may need a thick coating even for a 60 minute rating, while a heavier hot-rolled section may need much less. That is why the manufacturer’s data sheet gives thickness tables for each product by rating and section factor, and why a single price per square foot cannot be quoted without knowing your sections.

How coating delivers the rating

An intumescent coating swells in fire and slows the heat reaching the steel. The coating is tested on steel sections in approved laboratories, and its performance is recorded as thickness against rating and section factor. When the applied dry film thickness matches or exceeds the value in the table for your section, the member is considered protected to that rating.

Jotun supplies intumescent products such as Steelmaster and Jotachar. The correct choice depends on the rating, the section and the surrounding conditions. Check the product data sheet for the tested thickness range and limits. Higher ratings, particularly 90 and 120 minutes on slim sections, may need very thick films, and in such cases alternatives such as cementitious spray or board protection can be more practical. A fair supplier will say so.

The effect of Delhi NCR conditions on the rating

The rating assumes the coating is intact and bonded when a fire starts. Years of service in the region can test that assumption. Summer heat above 45 degrees Celsius dries out some films and can stress them. Monsoon humidity and condensation can attack uncovered intumescent. Winter smog and industrial deposits around Sahibabad, Loni, Faridabad and Bawana can stain and chemically attack unprotected films. A correct topcoat, such as a Hardtop polyurethane, and regular inspection keep the coating able to deliver the rating it was designed for.

Common mistakes about the fire rating of steel structures

  1. Confusing rating with fire resistance of the whole building. Steel member rating is one part; compartment walls, doors, sprinklers and exits are others.
  2. Applying one rating to all steel. Different members often carry different ratings. Coating everything at the highest rating wastes money.
  3. Ignoring section size. Using a thickness for a heavy section on a light one gives a lower real rating.
  4. Forgetting connections and brackets. Joints, cleats and bolts heat too and need coverage.
  5. Changing steel after the coating plan is made. Even a small change in section size can change the required thickness.

Documents you should keep

After the work is done, keep the approved rating statement, the data sheet of the system used, the batch details, daily application records and the dry film thickness readings by member. Future owners, insurers and fire inspectors may ask for them. If you later add floors, move equipment or cut openings, these records show what was originally protected.

Support from VTech

VTech is an authorised Jotun distributor and dealer based in Sahibabad, Ghaziabad. We serve buyers in Delhi, Noida, Greater Noida, Gurgaon and Faridabad. We do not set the legal rating, which belongs to your consultant and the authority, but we help you match a Jotun system to the rating and sections you have been given. See our products and industrial solutions for the wider range of coatings we supply, and read the about page to see how long we have served the region.

How the rating affects budget and schedule

Ratings drive cost because they drive thickness, and thickness drives both material and application time. A 30 minute requirement on heavy sections may need only a thin film applied in a few passes. A 120 minute requirement on slim sections may need several heavy coats with long drying gaps between them. On a tight construction programme in Gurgaon or Noida, this can become a critical path item, because steel cannot be handed over to the next trade until the coating has cured and been measured.

It is therefore wise to settle the rating early. If the rating on a member can be reduced legitimately by changing the structural design, for example by using a heavier section or by adding a fire-rated enclosure, your consultant can compare the total cost. Do not reduce thickness on site to save money. The rating is only valid when the tested thickness is achieved.

Fire rating of steel structures in different NCR building types

Different buildings in the region raise different questions. In a single-storey shed in Sahibabad or Bawana, the main concern may be life safety during escape, and the consultant may require protection only to key columns. In a multi-storey office or hospital in Noida, Gurgaon or Delhi, floors and columns often need a higher rating because evacuation takes longer and fire services reach upper floors with more difficulty. In a mall or hotel, large crowds and long travel distances raise the stakes. In a cold storage warehouse, insulated panels and stored goods can add to the fire load, so the fire design needs careful attention.

In all cases, start from the design document, not from the product. Once you know the rating, the section list and the exposure, the coating choice becomes straightforward.

How to get started: what to tell us when you call

To discuss the fire rating of steel structures in your project, keep these details ready: the required rating for each member group as written by your consultant, the section sizes or a drawing, the total surface area or tonnage, whether steel is new or old, indoor or outdoor, the finish needed, and the dates for fabrication and erection. If any of these are unknown, tell us, and we will explain what to ask for.

Call +91 98111 70042 or send your details through the contact page. We will suggest a suitable system and quote on product, pack size, current rates and stock.

Frequently asked questions

What does a 60 minute fire rating mean for steel?

It means a steel member, with its protection, is expected to keep carrying its design load for 60 minutes in a standard test fire. It is a design and test measure, not a prediction of how long a real fire would take to cause failure.

Who decides the fire rating of my steel building?

Your architect and fire safety consultant set it from the National Building Code of India 2016 Part 4 and local fire authority needs, based on occupancy and height. Ask for the rating by member in writing before you order coating.

Why does the same rating need different coating thickness?

Slim, light steel sections heat faster than heavy ones, so they need a thicker coating for the same rating. The product data sheet lists thickness against rating and section factor, so check it for your actual sections.

Is a 120 minute rating possible with paint?

Often yes on suitable sections, but the required film can be very thick, especially on slim members. For high ratings on hidden steel, cementitious spray or boards can be more practical. A supplier should advise on the best option.

Does the fire rating last forever once painted?

Not automatically. The rating depends on the coating staying intact and bonded. Damage, moisture, corrosion or later welding can reduce performance. Regular inspection, repair with compatible products and a suitable topcoat help maintain the rating.