VTech Solution · Sahibabad, Ghaziabad · Authorised Jotun & Graco Distributor Call +91 98111 70042 sales@vtechsolution.co.in

Fire Protection Coating for Malls, Hospitals and Commercial Buildings

Fire Protection Coating for Malls, Hospitals and Commercial Buildings

What is fire protection coating for buildings?

Fire protection coating for buildings is a paint system, usually intumescent, applied to structural steel so that it stays strong longer in a fire. In malls, hospitals and offices it protects exposed columns and beams while keeping a clean, smooth, coloured finish that suits the interior.

Commercial buildings in Delhi, Noida, Gurgaon and Ghaziabad are full of people, and many of them use steel frames with large open spans. Malls have atriums and food courts, hospitals have patients who cannot walk out unaided, and offices and hotels hold hundreds of occupants on upper floors. In such places the structure must stay up long enough for everyone to leave. This article explains how fire protection coating for buildings is chosen and applied in these public and commercial settings, and what owners, architects and facility managers should check before work starts.

Why commercial buildings are different from sheds

In a factory, the main concern is often property and continuity of production. In a mall, hospital or hotel, the first concern is life safety. Evacuation takes longer, people do not know the building, crowds create bottlenecks and some occupants need help. Fire ratings required for the structure are therefore often higher, and authorities pay closer attention to approvals and documents.

Appearance matters as well. Exposed steel in a lobby, atrium or parking podium is seen every day. A rough, heavy coating may not be acceptable to the architect. This is where thin-film intumescent coatings are widely used, because they can be applied in a smooth finish and coloured with a topcoat to suit the interior design.

Where the coating goes inside these buildings

  • Mall atriums and feature steel. Exposed trusses, columns and bracing seen from the shopping floors.
  • Hospital blocks. Columns and beams in corridors, operation theatre floors and plant rooms, depending on the design.
  • Office towers. Floor beams and columns, often concealed above ceilings or behind walls but still needing protection.
  • Hotels and banquet halls. Long-span roof steel and mezzanines.
  • Multi-level car parks. Steel decks, columns and ramps, usually with weather exposure.
  • Data centres and plant rooms. Steel supporting critical equipment, where structural stability is vital.

Which members are protected, and to what rating, is a design decision. Fire safety for these buildings in India is guided by the National Building Code of India 2016, Part 4, and by the state fire service rules which apply in Delhi, Uttar Pradesh and Haryana. Your fire consultant translates these into a schedule of members and ratings.

Choosing fire protection coating for buildings with exposed steel

When the steel is visible, there are three questions to answer: how does it look, how does it last and how does it perform in fire.

Finish and colour

Thin-film systems can give a smooth surface that is closer to normal paint. Texture, sheen and colour are decided by the topcoat. Ask for a sample panel on a steel plate or on a section of the actual building to approve the look before the full job. Matching colours across many coats, lighting conditions and different applicators is harder than it looks.

Durability in use

Corridors, lobbies and atriums see trolleys, cleaning machines, ladders and people. Lower portions of columns are most likely to be damaged. Consider a tougher topcoat or physical guards in such places. Jotun offers primers in the Penguard family and polyurethane topcoats such as Hardtop, and intumescent products such as Steelmaster, which are part of systems for different exposures. The correct system depends on your conditions and the data sheet.

Fire performance

The coating thickness must match the rating and the section size, according to the data sheet. A colour finish never replaces the tested thickness.

Concealed steel and other methods

Not all steel needs to be painted. If beams and columns are hidden behind plasterboard, ceilings or masonry, the architect may choose a different method, such as boards or cementitious spray, which can be economical for large areas and high ratings. Painting may still make sense where access is limited, where the site schedule is tight or where the same coating can serve as the corrosion primer. A mixed approach is common: paint where steel is visible, other methods where it is not. Ask your consultant to compare costs for the whole building rather than fixating on the paint line alone.

Building type Typical concern Coating approach to discuss
Mall Visible steel, crowds, long escape routes Smooth thin-film system with colour topcoat
Hospital Patients who need help, cleanliness, limited downtime Low odour, well-controlled application, durable washable topcoat
Office tower Large floor areas, high ratings, concealed steel Mixed methods; paint on visible steel
Hotel Mezzanines, banquet roofs, guest areas Finish control and phased work
Car park Weather, vehicle impact, exhaust Durable weather-resistant system

Applying in occupied or operating buildings

Retrofit work in hospitals and malls is the hardest case. Areas stay open, noise and dust must be limited and safety rules are strict. Plan the following.

  1. Night or phased work. Many mall jobs are done between closing and opening. Hospitals may allow work ward by ward.
  2. Dust and odour control. Use screens, extraction and low-odour products where available. Check data sheets for solvent content and ventilation needs.
  3. Hot work permits. No welding or grinding sparks near stock or fresh coating without controls.
  4. Protection of finishes. Floors, glass, fittings and medical equipment must be covered.
  5. Safe access. Use platforms or lifts, with edge protection in atriums.
  6. Waste and cleaning. Plan removal of masking, empty tins and dust each shift.

Surface preparation in finished buildings

For new construction, steel arrives primed or is blasted at the fabricator. For older buildings, the surface may carry old paint, rust and dirt. Blasting is the usual path for heavy corrosion, but in an occupied building it is hard to contain. Alternatives such as hand or power tool cleaning may be accepted in some cases, but only where the primer and intumescent data sheets allow it. Never assume. Ask for a trial patch and an adhesion test before committing to the full area.

Documents your approvers and insurers may ask for

  • The fire rating schedule by member from the consultant.
  • The data sheet and thickness table of the chosen system.
  • Batch records and delivery notes of the coating.
  • Dry film thickness readings by member and location.
  • Photographs before and after application.
  • Repair and maintenance plan for the coating.

Keep these in the building’s fire safety file. Facility managers will need them during audits and renovation planning.

Mistakes to avoid with fire protection coating for buildings

The first is choosing the coating after the interior design is finished. By then the colour scheme, lighting and ceiling heights are fixed, and a thick film can clash with them. Bring the coating decision into the design stage. The second is letting different trades damage the film. Electricians, plumbers and ceiling contractors often fix brackets to coated steel. Draw up rules for who can fix what, and where, and how damage is reported. The third is ignoring maintenance. A cracked or peeling film gives little protection, and in a busy building small damage often goes unreported for years.

Local supply and support

VTech is an authorised Jotun distributor and dealer in Sahibabad, Ghaziabad, supplying fire protection coating for buildings across Delhi, Noida, Greater Noida, Gurgaon and Faridabad. We can supply the range of Jotun products that make up a protective system and help you plan quantities and deliveries to match your site programme, subject to stock. To see wider options for your project, visit our products page or learn about VTech.

Questions facility managers should ask

Facility managers inherit the building after the contractor leaves, so their questions are practical. Who repairs the coating if a column is damaged by a trolley or a pipe fitter? Which touch-up materials are compatible, and are they kept in store? How often will the film be inspected, and who signs the record? What happens to the rating when a new tenant wants to fix signage, partitions or ceiling hangers to coated steel? A short written procedure for these points protects the investment. Without it, the rating of the structure slowly drifts below the figure on the drawing, and nobody notices until an audit.

It also helps to label which members are coated and to what rating on a simple plan kept with the fire safety file. When renovations are planned in Noida or Gurgaon offices and retail blocks, contractors can read the plan before they cut, drill or weld.

Planning fire protection coating for buildings alongside other finishes

Coating should be sequenced with other trades. Steel is usually coated after erection and before ceilings, partitions and cladding close the space. If ceilings are fitted first, access to beams and columns is lost, and the job becomes slower and costlier. If the coating is applied too early, welding and bolting by other trades damages it. A good programme keeps a clear window for surface preparation, priming, intumescent coats, curing, thickness checks and topcoat, and then hands over to the finishing trades. Delhi NCR winters add a further point: cold mornings and fog slow drying, so allow extra days rather than rushing a coat onto damp steel.

How to get started: what to tell us when you call

For a useful first conversation, share the building type and address, the floors or areas involved, the rating from your consultant, whether steel is exposed or concealed, the finish and colour wanted, the steel condition, occupancy during work and the planned start date. A drawing, photographs and the architect’s finish specification help us suggest a suitable Jotun system.

You can call +91 98111 70042 or send details through the contact page. Prices depend on product, thickness, pack size and current rates, and we quote on the call.

Frequently asked questions

Can fire protection coating be colour matched to the interior?

Yes, in most thin-film systems a colour topcoat gives the colour and sheen. Approve a sample panel first. Check the data sheet, as the topcoat must be compatible with the intumescent and should not change the tested system.

Is fire protection coating needed in all hospitals and malls?

The requirement depends on structure type, height, occupancy and approvals. Many steel-framed hospitals and malls need rated structural members. Your fire consultant should confirm it using the National Building Code of India 2016 Part 4 and local fire authority rules.

Can the work be done while the building is open?

It can be done in phases, often at night, with dust control, screens, hot work permits and safe access. Hospitals need extra care. Plan the programme with the facility manager and check product data sheets for ventilation needs.

What is the difference between thin-film and thick-film coating?

Thin-film coatings give a smoother finish and are common indoors on visible steel. Thick-film epoxy types are tougher and suit harsher industrial or outdoor settings. Choice depends on rating, exposure and appearance, so check the product data sheet.

Does VTech supply Jotun fire protection products for commercial projects?

Yes. VTech is an authorised Jotun distributor and dealer in Sahibabad, Ghaziabad, and supplies Delhi NCR. Fire protection products such as Steelmaster and Jotachar, with matching primers and topcoats, are subject to stock. Call with your rating and steel details.